Scientific and production enterprise "АММА"
about
Scientific and Production Enterprise "АММА" deals in design and production of equipment in particular meant for projects implemented in remote areas, where the land transportation infrastructure is rather poor. The equipment is operated in oil refining and gas processing, petrochemical, gold mining and nuclear power industries. Our considerable production capacities, profound staff and versatile structure allow to implement any non-typical and technically complex projects in compliance with the Customer's requirements.
Issued to the member of AMMA self-governing company
Certificate of Conformance on BBT-АММА Process Modular Containers
Conforms with the Technical Regulations of the Customs Union TR CU 010/2011 On Safety of Equipment and Machinery. Technical Specifications TU 3683-001-64137682-2010
Certificate of Conformance on Oil Field Equipment: NS-АММА Pumping Station
Confirms with the Technical Regulations of the Customs Union TR CU 010/2011 On Safety of Equipment and Machinery. Technical Specifications TU 3667-003-64137682-2012
Certificate of Conformance on KNS-АММА Sewage Lift Pump Units (Stations)
Conforms with the Technical Regulations of the Customs Union TR CU 010/2011 On Safety of Equipment and Machinery. Technical Specifications TU 4859-002-64137682-2016
Confirms with the Technical Regulations of the Customs Union TR CU 004/2011 On Safety of Low Voltage Equipment, TR CU 020/2011 Electromagnetic Compatibility of Hardware. Technical Specifications TU 271231-001-64137682-2020
Declaration of Conformance on Oil Filed Equipment: Choke and Kill Line Unit (YZL-АММА), Series TNO
The products are issued in compliance with GOST 32569-2013 Steel Process Pipelines, SNiP 3.058.05-84 Process Equipment and Process Pipelines
Certificate of Conformance on OP Proppant Knock Out Drum, Proppant Knock Out Drum
Confirms with the Technical Regulations of the Customs Union TR CU 010/2011 On Safety of Equipment and Machinery. Technical Specifications TU 28.99.39-021-64137682-2017
Certificate of Conformance on BMK-АММА Packaged Modular Boiler Room
Confirms with the Technical Regulations of the Customs Union TR CU 010/2011 On Safety of Equipment and Machinery. Technical Specifications TU 3683-005-64137682-2014
Certificate of Conformance on Equipment Operating under Overpressure: Pig Trap Station
Confirms with the Technical Regulations of the Customs Union TR CU 032/2013 On Safety of Equipment and Machinery.Technical Specifications TU 3683-005-64137682-2014
Certificate of Conformance on Equipment Operating under Overpressure: Adsorbers, Steel Vessels, Receivers, Air Receivers, Bulk-Capacity Tanks, Horizontal Cylindrical Vessels
Certificate of Conformance on Equipment Operating under Overpressure: Adsorbers, Steel Vessels, Receivers, Air Receivers, Bulk-Capacity Tanks, Horizontal Cylindrical Vessels. Technicals Specifications TU 28.99.39-023-64137682-2020 Welded Steel Vessels, Filters and Tanks Operating under Overpressure
Certificate of Conformance on Equipment Operating under Overpressure: ГС gas separators, НГС Oil-Gas Separator, НГСВ Oil/Gas Separators With Water Knockout, Rotary Separator, Three-Phase Separator, Flare Knock Out Drums
Confirms with the Technical Regulations of the Customs Union TR CU 032/2013 On Safety of Equipment and Machinery. Conforms with the Technical Regulations of the Customs Union TR CU 032/2013 On Safety of Equipment and Machinery
Certificate on Typical Product Sample: БК-АММА Condensate Unit
Confirms with the Technical Regulations of the Customs Union TR CU 010/2011 On Safety of Equipment and Machinery. Technical Specifiations TU 28.99.39-022-64137682-2019 БК-АММА Condensate Units
The quality management system and the health, safety and environment system apply to the entire staff of SPE AMMA.
AMMA's top management admits how vital this is to provide a sustainable and high-quality work in the company, care of the employees' lives and health, reduce damage caused to the environment. That's why the top management takes responsibility for:
- impactful, effective and continuous improvement of the quality management system and the health, safety and environment system based on the process approach and risk-oriented mindset, according to ISO 9001:2015 and GOST R ISO 9001–2015, ISO 14001:2015 and GOST R ISO 14001–2016, ISO 45001:2018;
- preserving and maintaining the integrated management system when planning and introducing changes to the management system;
- for defining resources, their amount and time frames for them in order to keep the integrated management system functioning;
- making sure that the company's business processes are aligned with the integrated management system;
- protecting the environment from harm and destruction related to the company's operation, its products and services, monitoring and preventing adverse impact in the significant environmental aspects;
- ensuring safe and favourable working conditions to prevent injuries and harm to the health;
- distributing employees, making sure they are aware of their obligations, responsibilities and capabilities at work in order to reach the set goals of the processes;
- continuously increasing the level of contentment in stakeholders by defining and meeting their requirements and expectations in the field of quality, occupational safety and environment; for continuous improvement (including improvement of the products and services quality);
- aspiring for a long-term cooperation with customers and suppliers;
- adopting new technologies, continuously enhancing amounts and lists of the released products;
- creating conditions to form the staff that is highly-qualified, profound and motivated to work effectively; the company encourages the personnel's professional growth, creative and leadership potential; this will help solve routine or potential issues, make a close-knit team, engage all the personnel into a collective work in order to reach the companies is willing to achieve;
- stimulating personnel to fulfill all the requirements of the management system, stimulating other managers that help introduce the management system; making the staff aware of their contribution to the management system, the benefits of improvements and better results, consequents of non-compliance with the requirements of the management system;
- stimulating personnel to fulfill all the requirements of the management system, stimulating other managers that help introduce the management system; making the staff aware of their contribution to the management system, the benefits of improvements and better results, consequents of non-compliance with the requirements of the management system.
The top management takes responsibility for strictly complying with the principles above, making sure this policy is maintained, the management system's goals are being achieved, the management system is up-to-date. The top management controls and makes the staff and other parties aware of the policy. The top management makes AMMA staff understand and maintain this policy.
Certificate of Conformance GOST R ISO 9001-2015 (ISO 9001:2015)
Applicable to design, manufacture, installation, commissioning, start-up and technical maintenance of the process and engineering equipment
Certificate of Conformance on Health and Safety Management System GOST R ISO 45001-2020 (ISO 45001:2018)
Applicable to conducted works
Certificate of Conformance GOST R ISO 14001–2016 (ISO 14001:2015)
Confirms that the environment management system complies with the requirements of GOST R ISO 14001-2016